HWY W BROADWAY over COMB HAUL RD & MBTA RED

1.1 KM SW OF D ST · County 025, Massachusetts · Built 1918 · 4 Lanes · 18,103 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B162053GRDOT634
Year Built
1918
Length
20.7 m (67.9 ft)
Max Span
18.4 m
Width
25.4 m (83.3 ft)
Lanes
4
Daily Traffic
18,103
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,463,000
Total Project Cost
$5,195,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.