HWY W FOURTH ST over WATER FORT POINT CHANNEL

.32 KM S I-90 · County 025, Massachusetts · Built 1958 · 5 Lanes · 13,200 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
B162762L3DOTNBI
Year Built
1958
Length
12.5 m (41 ft)
Max Span
6.1 m
Width
19.5 m (64 ft)
Lanes
5
Daily Traffic
13,200
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,948,000
Total Project Cost
$2,923,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.