I 93 RAMP XX over HWY W FOURTH ST

0.1 K E. OF 193 NB · County 025, Massachusetts · Built 2002 · 2 Lanes · 6,041 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B1665982NDOTNBI
Year Built
2002
Length
189.1 m (620.4 ft)
Max Span
47 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
6,041
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,252,000
Total Project Cost
$13,879,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.