I 93 RAMP AS over OTHER RELIEF

UNIT 1 · County 025, Massachusetts · Built 2003 · 1 Lanes · 25,600 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B166659AYDOTNBI
Year Built
2003
Length
81.9 m (268.7 ft)
Max Span
40.7 m
Width
7.5 m (24.6 ft)
Lanes
1
Daily Traffic
25,600
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,534,000
Total Project Cost
$2,302,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.