I 93 SB over HWY W FOURTH ST

UNIT 1 · County 025, Massachusetts · Built 2000 · 6 Lanes · 164,570 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B166569AJDOTNBI
Year Built
2000
Length
91.3 m (299.5 ft)
Max Span
45.8 m
Width
27.3 m (89.6 ft)
Lanes
6
Daily Traffic
164,570
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,301,000
Total Project Cost
$6,452,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.