I 93 NB over HWY W FOURTH ST
B16661B UNIT 1 · County 025, Massachusetts · Built 2002 · 3 Lanes · 82,300 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.342836, -71.061789
This bridge is in worse condition than 55.1% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 24 years old.
Nearby Bridges
I 93 RAMP XX over HWY W FOURTH ST
Built 2002
I 93 RAMP X over HWY W FOURTH ST
Built 2004
I 93 RAMP K over HWY W FOURTH ST
Built 2002
I 93 SB over HWY W FOURTH ST
Built 2000
I 93 SB over HWY TRAVELER ST & PARK
Built 2000
HWY W FOURTH ST over WATER FORT POINT CHANNEL
Built 1958
I 93 RAMP AS over OTHER RELIEF
Built 2003
I 93 RAMP X over HWY BROADWAY
Built 2004
I 93 NB over HWY BROADWAY
Built 2002
I 93 RAMP XX over HWY HOV EB
Built 2001
Bridge Details
- Structure #
- B166618R0DOTNBI
- Year Built
- 2002
- Length
- 188.6 m (618.8 ft)
- Max Span
- 45.7 m
- Width
- 16.5 m (54.1 ft)
- Lanes
- 3
- Daily Traffic
- 82,300
- Material
- Prestressed Concrete Continuous
- Design
- Segmental Box Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $20,246,000
- Total Project Cost
- $30,370,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.