I 93 NB over HWY W FOURTH ST

B16661B UNIT 1 · County 025, Massachusetts · Built 2002 · 3 Lanes · 82,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B166618R0DOTNBI
Year Built
2002
Length
188.6 m (618.8 ft)
Max Span
45.7 m
Width
16.5 m (54.1 ft)
Lanes
3
Daily Traffic
82,300
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$20,246,000
Total Project Cost
$30,370,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.