I 93 SB over HWY TRAVELER ST & PARK

UNIT 2 · County 025, Massachusetts · Built 2000 · 5 Lanes · 148,110 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B166569N3DOTNBI
Year Built
2000
Length
159.9 m (524.6 ft)
Max Span
45.3 m
Width
22.8 m (74.8 ft)
Lanes
5
Daily Traffic
148,110
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$23,683,000
Total Project Cost
$35,525,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.