I 93 RAMP X over HWY W FOURTH ST

I93/I90 INTERCHANGE · County 025, Massachusetts · Built 2004 · 1 Lanes · 2,470 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B166589RNDOTNBI
Year Built
2004
Length
172.2 m (565 ft)
Max Span
46.1 m
Width
7.2 m (23.6 ft)
Lanes
1
Daily Traffic
2,470
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,044,000
Total Project Cost
$6,067,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.