I 93 RAMP K over HWY W FOURTH ST

0.5 M S. OF I90 · County 025, Massachusetts · Built 2002 · 2 Lanes · 11,717 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B166628TTDOTNBI
Year Built
2002
Length
216.9 m (711.6 ft)
Max Span
46.2 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
11,717
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,791,000
Total Project Cost
$13,187,000