HWY W FOURTH ST over COMB FNDRY ST&MBTA&AMTK

1.6 KM SE OF JCT I93&90 · County 025, Massachusetts · Built 1893 · 2 Lanes · 14,700 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B161263FHDOTNBI
Year Built
1893
Reconstructed
1990
Length
159.4 m (523 ft)
Max Span
26.2 m
Width
17.9 m (58.7 ft)
Lanes
2
Daily Traffic
14,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,924,000
Total Project Cost
$13,387,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.