I 93 RAMP K over COMB I93NB & RAMP MW
0.5 M S. OF I-90 · County 025, Massachusetts · Built 2002 · 2 Lanes · 12,563 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.344006, -71.060839
This bridge is in worse condition than 24.1% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 24 years old.
Nearby Bridges
I 93 NB over HWY BROADWAY
Built 2002
I 93 RAMP XX over HWY HOV EB
Built 2001
I 93 RAMP X over HWY BROADWAY
Built 2004
I 93 RAMP MW over COMB HOV EB & MBTA WYE
Built 2001
I 93 RAMP AS over OTHER RELIEF
Built 2003
I 93 RAMP AS over HWY BROADWAY
Built 2003
I 93 RAMP XXE over HWY BROADWAY/EXT
Built 2002
I 93 HOV RAMP EB over OTHER RELIEF
Built 2002
I 93 RAMP FX over OTHER RELIEF
Built 2004
I 93 RAMP AS over OTHER RELIEF
Built 2003
Bridge Details
- Structure #
- B166628TPDOTNBI
- Year Built
- 2002
- Length
- 135.1 m (443.2 ft)
- Max Span
- 47.2 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 12,563
- Material
- Prestressed Concrete Continuous
- Design
- Segmental Box Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $9,324,000
- Total Project Cost
- $13,987,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.