I 93 RAMP K over COMB I93NB & RAMP MW

0.5 M S. OF I-90 · County 025, Massachusetts · Built 2002 · 2 Lanes · 12,563 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B166628TPDOTNBI
Year Built
2002
Length
135.1 m (443.2 ft)
Max Span
47.2 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
12,563
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,324,000
Total Project Cost
$13,987,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.