I 93 RAMP FX over OTHER RELIEF

I93/I90 INTERCHANGE · County 025, Massachusetts · Built 2004 · 1 Lanes · 1,333 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B166669QRDOTNBI
Year Built
2004
Length
110.7 m (363.2 ft)
Max Span
46.3 m
Width
6.8 m (22.3 ft)
Lanes
1
Daily Traffic
1,333
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,632,000
Total Project Cost
$5,449,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.