I 93 RAMP K over HWY RAMP MW & HOV EB

0.5 MI S. OF I-90 · County 025, Massachusetts · Built 2002 · 1 Lanes · 11,583 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B166628TMDOTNBI
Year Built
2002
Length
66.7 m (218.8 ft)
Max Span
34.2 m
Width
7.9 m (25.9 ft)
Lanes
1
Daily Traffic
11,583
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,253,000
Total Project Cost
$1,880,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.