I 93 RAMP X over OTHER RELIEF

I93/I90 INTERCHANGE · County 025, Massachusetts · Built 2004 · 1 Lanes · 1,221 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B166589B0DOTNBI
Year Built
2004
Length
156.2 m (512.5 ft)
Max Span
46.3 m
Width
7.1 m (23.3 ft)
Lanes
1
Daily Traffic
1,221
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,404,000
Total Project Cost
$6,607,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.