I 93 RAMP K over COMB I90&I93RMP CC&AMTK

UNIT 1 · County 025, Massachusetts · Built 2005 · 1 Lanes · 1,200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B166629Q4DOTNBI
Year Built
2005
Length
71.2 m (233.6 ft)
Max Span
35.7 m
Width
7.9 m (25.9 ft)
Lanes
1
Daily Traffic
1,200
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,460,000
Total Project Cost
$9,691,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.