I 93 RMPS X XE over RR AMTRAK/MBTA

I93&I90 INT .4K SW P.O. · County 025, Massachusetts · Built 2005 · 2 Lanes · 2,316 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B166679QPDOTNBI
Year Built
2005
Length
43.3 m (142.1 ft)
Max Span
29.3 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
2,316
Material
Steel Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,514,000
Total Project Cost
$3,772,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.