I 93 RMPS X XE over RR AMTRAK/MBTA
I93&I90 INT .4K SW P.O. · County 025, Massachusetts · Built 2005 · 2 Lanes · 2,316 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.346031, -71.060514
This bridge is in worse condition than 1.6% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 21 years old.
Nearby Bridges
I 93 RAMP K over COMB I90&I93RMP CC&AMTK
Built 2005
I 93 SB over COMB I90 & AMTRAK
Built 2000
I 93 RAMP KK over COMB I90&RMP LL KK&AMTK
Built 2003
I 93 RAMP CC & FX over COMB I90& RP KK &AMTRK
Built 2003
I 93 HOV RAMP EB over RR AMTRAK
Built 2002
I 93 RAMP XX over COMB I90&I93RMP CC&AMTK
Built 2005
I 93 RAMP MW over COMB I90&RMP LL KK&AMTK
Built 2002
HWY ALBANY ST over COMB I90 & AMTRAK
Built 2005
I 93 HOV RAMP EB over I 93 RAMP XX
Built 2002
I 93 RAMP X over OTHER RELIEF
Built 2004
Bridge Details
- Structure #
- B166679QPDOTNBI
- Year Built
- 2005
- Length
- 43.3 m (142.1 ft)
- Max Span
- 29.3 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 2
- Daily Traffic
- 2,316
- Material
- Steel Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,514,000
- Total Project Cost
- $3,772,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.