I 93 SB over COMB I90 & AMTRAK

UNIT 4 · County 025, Massachusetts · Built 2000 · 5 Lanes · 116,881 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B166569Q6DOTNBI
Year Built
2000
Length
193.2 m (633.9 ft)
Max Span
62.6 m
Width
17.5 m (57.4 ft)
Lanes
5
Daily Traffic
116,881
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$44,835,000
Total Project Cost
$67,253,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.