I 93 RAMP CC & FX over COMB I90& RP KK &AMTRK

I93/I90 INTERCHANGE · County 025, Massachusetts · Built 2003 · 2 Lanes · 22,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B166769QLDOTNBI
Year Built
2003
Length
174.3 m (571.9 ft)
Max Span
46.7 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
22,400
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,818,000
Total Project Cost
$4,228,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.