I 93 SB over OTHER RELIEF

I93 · County 025, Massachusetts · Built 2000 · 4 Lanes · 108,879 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B165099RPDOTNBI
Year Built
2000
Length
61.8 m (202.8 ft)
Max Span
19.5 m
Width
19.3 m (63.3 ft)
Lanes
4
Daily Traffic
108,879
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,769,000
Total Project Cost
$11,654,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.