I 93 RAMP K over OTHER RELIEF

I-93/I-90 INTERCHANGE · County 025, Massachusetts · Built 2004 · 2 Lanes · 14,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B166629V0DOTNBI
Year Built
2004
Length
122.8 m (402.9 ft)
Max Span
42.4 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
14,000
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,983,000
Total Project Cost
$7,475,000