I 93 RAMP X over I 90 RAMP D & RAMP CC
I93/I90 INTERCHANGE · County 025, Massachusetts · Built 2004 · 2 Lanes · 1,939 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.348478, -71.059631
This bridge is in worse condition than 1.6% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 22 years old.
Nearby Bridges
I 93 RAMP K over OTHER RELIEF
Built 2004
HWY SO STA CONN over HWY INFIELD ACCESS
Built 2003
I 93 RAMP X ACCS over OTHER RELIEF
Built 2005
I 93 RAMP K over OTHER RELIEF
Built 2004
I 93 RAMP X over COMB RELIEF
Built 2004
I 90 RAMP Q & ALB over I 90 RAMP H
Built 2005
I 93 RAMP KK over OTHER RELIEF
Built 2003
HWY SO STA CONN over I 93 RAMPS CC KK D
Built 2004
HWY ALBANY EXT over I 90 RAMP H
Built 2005
HWY ACCESS BRG B over I 93 RAMP KK
Built 2003
Bridge Details
- Structure #
- B166589QWDOTNBI
- Year Built
- 2004
- Length
- 37.5 m (123 ft)
- Max Span
- 37.5 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,939
- Material
- Prestressed Concrete
- Design
- Segmental Box Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,540,000
- Total Project Cost
- $2,311,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.