I 93 RAMP X over I 90 RAMP D & RAMP CC

I93/I90 INTERCHANGE · County 025, Massachusetts · Built 2004 · 2 Lanes · 1,939 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B166589QWDOTNBI
Year Built
2004
Length
37.5 m (123 ft)
Max Span
37.5 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,939
Material
Prestressed Concrete
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,540,000
Total Project Cost
$2,311,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.