I 93 RAMP KK over OTHER RELIEF

.8 KM N OF I90 · County 025, Massachusetts · Built 2003 · 1 Lanes · 2,416 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B165069RRDOTNBI
Year Built
2003
Length
23.3 m (76.4 ft)
Max Span
7.3 m
Width
9.8 m (32.2 ft)
Lanes
1
Daily Traffic
2,416
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$306,000
Total Project Cost
$460,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.