I 93 NB over OTHER RELIEF
0.0 M S I-90 WB B16702 U2 · County 025, Massachusetts · Built 2002 · 3 Lanes · 77,653 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
42.3474, -71.058372
This bridge is in worse condition than 24.1% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 24 years old.
Nearby Bridges
I 93 NB over OTHER RELIEF
Built 2002
I 90 RAMP F over I 93 RMP KK &INFLD ACCS
Built 2004
I 93 RAMP KK over OTHER RELIEF
Built 2003
HWY ACCESS BRG B over I 93 RAMP KK
Built 2003
I 93 RAMP E-SS over I 93 RAMP C
Built 2002
HWY FRONTAGE RD over COMB I90 RPS&HOV&AMTK
Built 2002
HWY SO STA CONN over I 93 RAMPS CC KK D
Built 2004
I 93 RAMP K over OTHER RELIEF
Built 2004
HWY SO STA CONN over I 93 RAMPS CC KK D
Built 2004
HWY ACCES BRG A over I 93 RAMPS CC & D
Built 2004
Bridge Details
- Structure #
- B167028W4DOTNBI
- Year Built
- 2002
- Length
- 32.5 m (106.6 ft)
- Max Span
- 3.7 m
- Width
- 18.2 m (59.7 ft)
- Lanes
- 3
- Daily Traffic
- 77,653
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $720,000
- Total Project Cost
- $1,081,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.