I 93 RAMP E-SS over I 93 RAMP C

0.25 MI E OF I-93 · County 025, Massachusetts · Built 2002 · 1 Lanes · 517 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B166858W6DOTNBI
Year Built
2002
Length
40.2 m (131.9 ft)
Max Span
40.2 m
Width
7.7 m (25.3 ft)
Lanes
1
Daily Traffic
517
Material
Steel
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,514,000
Total Project Cost
$5,272,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.