I 93 RAMP E-SS over I 93 RAMP C
0.25 MI E OF I-93 · County 025, Massachusetts · Built 2002 · 1 Lanes · 517 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
42.34805, -71.057228
This bridge is in worse condition than 24.1% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 24 years old.
Nearby Bridges
HWY SO STA CONN over HWY FRONTAGE RD
Built 1995
HWY SO STA CONN over I 93 RAMPS CC KK D
Built 2004
HWY SO STA CONN over COMB MBTA & RELIEF
Built 1995
I 90 RAMP F over I 93 RMP KK &INFLD ACCS
Built 2004
HWY ACCESS BRG B over I 93 RAMP KK
Built 2003
HWY ACCES BRG A over I 93 RAMPS CC & D
Built 2004
HWY SO STA BUSWY over COMB MBTA & RELIEF
Built 1995
I 93 NB over OTHER RELIEF
Built 2002
HWY SO STA IB RP over RR MBTA
Built 1995
HWY SO STA OB RP over OTHER RELIEF
Built 1995
Bridge Details
- Structure #
- B166858W6DOTNBI
- Year Built
- 2002
- Length
- 40.2 m (131.9 ft)
- Max Span
- 40.2 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 1
- Daily Traffic
- 517
- Material
- Steel
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,514,000
- Total Project Cost
- $5,272,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.