HWY SO STA CONN over HWY FRONTAGE RD
SOUTH STATION · County 025, Massachusetts · Built 1995 · 2 Lanes
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.348458, -71.057219
This bridge is in worse condition than 1.6% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 31 years old.
Nearby Bridges
I 93 RAMP E-SS over I 93 RAMP C
Built 2002
HWY SO STA CONN over COMB MBTA & RELIEF
Built 1995
HWY SO STA CONN over I 93 RAMPS CC KK D
Built 2004
HWY SO STA BUSWY over COMB MBTA & RELIEF
Built 1995
HWY ACCES BRG A over I 93 RAMPS CC & D
Built 2004
HWY SO STA OB RP over OTHER RELIEF
Built 1995
I 90 RAMP F over I 93 RMP KK &INFLD ACCS
Built 2004
HWY ACCESS BRG B over I 93 RAMP KK
Built 2003
HWY SO STA IB RP over RR MBTA
Built 1995
HWY SO STA CONN over I 93 RAMPS CC KK D
Built 2004
Bridge Details
- Structure #
- B166779PHMBTNBI
- Year Built
- 1995
- Length
- 79.8 m (261.8 ft)
- Max Span
- 26.3 m
- Width
- 20.4 m (66.9 ft)
- Lanes
- 2
- Material
- Steel
- Design
- Box Beam or Girders - Multiple
- Owner
- Other State Agencies
- Last Inspected
- N/A
- Est. Improvement
- $10,595,000
- Total Project Cost
- $15,893,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.