HWY SO STA IB RP over RR MBTA

SOUTH STATION · County 025, Massachusetts · Built 1995 · 1 Lanes

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B16677BQ8MBTNBI
Year Built
1995
Length
120.7 m (396 ft)
Max Span
27.7 m
Width
7.6 m (24.9 ft)
Lanes
1
Material
Steel
Design
Box Beam or Girders - Multiple
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
$12,379,000
Total Project Cost
$18,569,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.