HWY SO STA CONN over COMB MBTA & RELIEF
SOUTH STATION · County 025, Massachusetts · Built 1995 · 4 Lanes
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.348819, -71.056875
This bridge is in worse condition than 1.6% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 31 years old.
Nearby Bridges
HWY SO STA BUSWY over COMB MBTA & RELIEF
Built 1995
HWY SO STA OB RP over OTHER RELIEF
Built 1995
HWY SO STA CONN over HWY FRONTAGE RD
Built 1995
HWY SO STA IB RP over RR MBTA
Built 1995
I 93 RAMP E-SS over I 93 RAMP C
Built 2002
HWY SO STA CONN over I 93 RAMPS CC KK D
Built 2004
HWY ACCES BRG A over I 93 RAMPS CC & D
Built 2004
HWY ACCESS BRG B over I 93 RAMP KK
Built 2003
I 90 RAMP F over I 93 RMP KK &INFLD ACCS
Built 2004
HWY SO STA CONN over I 93 RAMPS CC KK D
Built 2004
Bridge Details
- Structure #
- B16677BQ7MBTNBI
- Year Built
- 1995
- Length
- 23.4 m (76.8 ft)
- Max Span
- 23.4 m
- Width
- 21 m (68.9 ft)
- Lanes
- 4
- Material
- Steel
- Design
- Box Beam or Girders - Multiple
- Owner
- Other State Agencies
- Last Inspected
- N/A
- Est. Improvement
- $5,956,000
- Total Project Cost
- $8,935,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.