HWY ACCESS BRG B over I 93 RAMP KK
.15K W OF [email protected] CON · County 025, Massachusetts · Built 2003 · 2 Lanes · 600 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.348408, -71.058333
This bridge is in worse condition than 1.6% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 23 years old.
Nearby Bridges
I 90 RAMP F over I 93 RMP KK &INFLD ACCS
Built 2004
HWY ACCES BRG A over I 93 RAMPS CC & D
Built 2004
HWY SO STA CONN over I 93 RAMPS CC KK D
Built 2004
HWY SO STA CONN over I 93 RAMPS CC KK D
Built 2004
HWY SO STA CONN over HWY FRONTAGE RD
Built 1995
I 93 RAMP K over OTHER RELIEF
Built 2004
I 93 RAMP E-SS over I 93 RAMP C
Built 2002
I 93 RAMP X ACCS over OTHER RELIEF
Built 2005
I 93 RAMP X over I 90 RAMP D & RAMP CC
Built 2004
I 93 NB over OTHER RELIEF
Built 2002
Bridge Details
- Structure #
- B166889QBDOTNBI
- Year Built
- 2003
- Length
- 11.9 m (39 ft)
- Max Span
- 10.8 m
- Width
- 9.3 m (30.5 ft)
- Lanes
- 2
- Daily Traffic
- 600
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $686,000
- Total Project Cost
- $1,030,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.