I 93 RAMP X over I 90 & RAMPS CC & KK

I93/I90 INTERCHANGE · County 025, Massachusetts · Built 2004 · 2 Lanes · 2,066 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B166589QYDOTNBI
Year Built
2004
Length
169.4 m (555.8 ft)
Max Span
44.7 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
2,066
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,887,000
Total Project Cost
$10,331,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.