I 93 HOV RAMP EB over I 93 RAMP XX

0.8 KM S. OF I-90 · County 025, Massachusetts · Built 2002 · 2 Lanes · 5,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
B1666982HDOTNBI
Year Built
2002
Length
55.3 m (181.4 ft)
Max Span
29.2 m
Width
17.1 m (56.1 ft)
Lanes
2
Daily Traffic
5,900
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,217,000
Total Project Cost
$9,326,000