I 93 NB over COMB I90 RPS&HOV&AMTK

0.2 MI N I-90 EB · County 025, Massachusetts · Built 2002 · 3 Lanes · 116,800 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B166618QXDOTNBI
Year Built
2002
Length
200.2 m (656.8 ft)
Max Span
54.7 m
Width
16.5 m (54.1 ft)
Lanes
3
Daily Traffic
116,800
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$27,245,000
Total Project Cost
$40,868,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.