I 93 RAMP LL over COMB HOV EB & AMTRK&WYE

.5 MI S. OF I90 EB · County 025, Massachusetts · Built 2002 · 2 Lanes · 11,522 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
B166828M5DOTNBI
Year Built
2002
Length
157.8 m (517.7 ft)
Max Span
47.2 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
11,522
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$10,053,000
Total Project Cost
$15,080,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.