I 93 RAMP AS over OTHER RELIEF

0.65 KM SOUTH OF I-90 · County 025, Massachusetts · Built 2003 · 1 Lanes · 22,241 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B165089RQDOTNBI
Year Built
2003
Length
33.9 m (111.2 ft)
Max Span
16.4 m
Width
7.9 m (25.9 ft)
Lanes
1
Daily Traffic
22,241
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$636,000
Total Project Cost
$955,000