HWY W FIFTH ST over COMB HAUL RD & MBTA RED

1371 M SW OF D ST OFFICE · County 025, Massachusetts · Built 1918 · 2 Lanes · 1,939 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
B162013GNDOT634
Year Built
1918
Reconstructed
1997
Length
20.3 m (66.6 ft)
Max Span
18.6 m
Width
15.4 m (50.5 ft)
Lanes
2
Daily Traffic
1,939
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,100,000
Total Project Cost
$3,151,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.