HWY DORCHSTR AVE over COMB HAUL RD & MBTA RED

1.8 KM SW OF D ST · County 025, Massachusetts · Built 1917 · 4 Lanes · 34,913 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B161993H6DOT634
Year Built
1917
Reconstructed
1959
Length
30.9 m (101.4 ft)
Max Span
14.7 m
Width
18.3 m (60 ft)
Lanes
4
Daily Traffic
34,913
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,683,000
Total Project Cost
$5,525,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.