HWY RAMP K/L over OTHER RELIEF

MASS AVE. INT. · County 025, Massachusetts · Built 2002 · 2 Lanes · 44,224 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B16662915DOTNBI
Year Built
2002
Length
123.3 m (404.5 ft)
Max Span
45 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
44,224
Material
Steel Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,933,000
Total Project Cost
$2,900,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.