HWY RAMP K over OTHER RELIEF
BOSTON MASS AVE. INT. · County 025, Massachusetts · Built 2002 · 2 Lanes · 45,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.338825, -71.063464
This bridge is in worse condition than 1.6% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 24 years old.
Nearby Bridges
I 93 NB over OTHER RELIEF
Built 2002
HWY RAMP X/XX over OTHER RELIEF
Built 2000
I 93 SB over OTHER RELIEF
Built 1997
I 93 NB over HWY FRONTAGE RD NB
Built 2002
HWY RAMP K/L over OTHER RELIEF
Built 2002
HWY RAMP X/XX over HWY ALBANY ST
Built 2003
HWY RAMP K over OTHER RELIEF
Built 2002
I 93 SB over HWY ALBANY ST
Built 1997
HWY RAMP L over HWY RAMP FL
Built 2002
HWY RAMP K over OTHER RELIEF
Built 2002
Bridge Details
- Structure #
- B16662916DOTNBI
- Year Built
- 2002
- Length
- 226.9 m (744.4 ft)
- Max Span
- 45.4 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 45,000
- Material
- Steel Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $9,196,000
- Total Project Cost
- $13,795,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.