I 93 SB over OTHER RELIEF
ALBANY ST / FRONTAGE RD · County 025, Massachusetts · Built 1997 · 7 Lanes · 45,270 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.340228, -71.063742
This bridge is in worse condition than 24.1% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 29 years old.
Nearby Bridges
I 93 SB over HWY ALBANY ST
Built 1997
HWY RAMP X/XX over HWY ALBANY ST
Built 2003
I 93 NB over HWY FRONTAGE RD NB
Built 2002
HWY RAMP K/L over OTHER RELIEF
Built 2002
HWY RAMP X/XX over OTHER RELIEF
Built 2000
I 93 NB over OTHER RELIEF
Built 2002
HWY RAMP L over HWY RAMP FL
Built 2002
HWY RAMP K over OTHER RELIEF
Built 2002
HWY RAMP K over OTHER RELIEF
Built 2002
I 93 SB over HWY W FOURTH ST
Built 2000
Bridge Details
- Structure #
- B1665491EDOTNBI
- Year Built
- 1997
- Length
- 57.5 m (188.6 ft)
- Max Span
- 18.4 m
- Width
- 26.3 m (86.3 ft)
- Lanes
- 7
- Daily Traffic
- 45,270
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $7,501,000
- Total Project Cost
- $11,252,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.