I 93 SB over HWY ALBANY ST

MASS AVE. INT. · County 025, Massachusetts · Built 1997 · 6 Lanes · 164,570 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B1665691CDOTNBI
Year Built
1997
Length
314.9 m (1033.1 ft)
Max Span
46.6 m
Width
25 m (82 ft)
Lanes
6
Daily Traffic
164,570
Material
Steel Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$27,976,000
Total Project Cost
$41,965,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.