HWY W SECOND ST over COMB HAUL RD & MBTA RED

.8 KM SW D ST · County 025, Massachusetts · Built 1918 · 2 Lanes · 8,146 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B162093GUDOT634
Year Built
1918
Length
21.9 m (71.9 ft)
Max Span
19.7 m
Width
15.6 m (51.2 ft)
Lanes
2
Daily Traffic
8,146
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,229,000
Total Project Cost
$3,344,000