HWY W THIRD ST over COMB HAUL RD & CSX

.8 KM SW OF D ST OFFICE · County 025, Massachusetts · Built 1918 · 2 Lanes · 1,600 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B162073GTDOT634
Year Built
1918
Length
20.1 m (65.9 ft)
Max Span
18.3 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
1,600
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,114,000
Total Project Cost
$3,172,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.