IRR BIA RTE 5 over RIO PESCADO RIVER
1 KM N JCT RTE 5 & HWY 53 · County 031, New Mexico · Built 1973 · 2 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 5 | Fair |
Location
35.127711, -108.650269
This bridge is in worse condition than 79.2% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 53 years old.
Nearby Bridges
IRR/NM-53 over HORSEHEAD CANYON
Built 1986
IRR/NM-602 over RIO PESCADO
Built 1968
IRR/NM-602 over RIO NUTRIA
Built 2007
IRR/NM-53 over RIO PESCADO
Built 1987
NM-36 over KNIFE HILL CANYON
Built 1990
IRR BIA RTE 4 over ZUNI RIVER
Built 1976
IRR BIA RTE 5 over BRANCH WASH-NUTRIA LAKE
Built 1973
NM-53 over TOGEYE CANYON
Built 1988
IRR BIA RTE 5 over CIBOLA WASH
Built 1973
IRR BIA RTE 149 over DRAINAGE DITCH
Built 1987
Bridge Details
- Structure #
- 00000000000M401
- Year Built
- 1973
- Length
- 49.1 m (161.1 ft)
- Max Span
- 15.8 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $51,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.