IRR/NM-602 over RIO PESCADO
30.6 MI S OF I-40 · County 031, New Mexico · Built 1968 · 2 Lanes · 1,146 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
35.115486, -108.697092
This bridge is in worse condition than 62.6% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 58 years old.
Nearby Bridges
IRR/NM-53 over HORSEHEAD CANYON
Built 1986
IRR/NM-602 over RIO NUTRIA
Built 2007
IRR BIA RTE 5 over RIO PESCADO RIVER
Built 1973
IRR BIA RTE 4 over ZUNI RIVER
Built 1976
NM-36 over KNIFE HILL CANYON
Built 1990
IRR/NM-53 over RIO PESCADO
Built 1987
IRR BIA RTE 327 over ZUNI RIVER
Built 1991
IRR/NM-53 over ZUNI RIVER
Built 1975
IRR BIA RTE 5 over BRANCH WASH-NUTRIA LAKE
Built 1973
31-003A over UNNAMED WATERWAY
Built 1966
Bridge Details
- Structure #
- 000000000003372
- Year Built
- 1968
- Length
- 25 m (82 ft)
- Max Span
- 9.3 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,146
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $121,000
- Total Project Cost
- $182,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.