IRR/NM-53 over RIO PESCADO
6.0 MI E OF NM-602/ZUNI · County 031, New Mexico · Built 1987 · 2 Lanes · 1,071 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
35.106714, -108.587164
This bridge is in worse condition than 62.6% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 39 years old.
Nearby Bridges
IRR BIA RTE 5 over RIO PESCADO RIVER
Built 1973
NM-53 over TOGEYE CANYON
Built 1988
IRR BIA RTE 149 over DRAINAGE DITCH
Built 1987
IRR/NM-53 over HORSEHEAD CANYON
Built 1986
IRR/NM-602 over RIO PESCADO
Built 1968
NM-36 over KNIFE HILL CANYON
Built 1990
IRR/NM-602 over RIO NUTRIA
Built 2007
IRR BIA RTE 5 over BRANCH WASH-NUTRIA LAKE
Built 1973
IRR BIA RTE 4 over ZUNI RIVER
Built 1976
IRR BIA RTE 5 over CIBOLA WASH
Built 1973
Bridge Details
- Structure #
- 000000000008675
- Year Built
- 1987
- Length
- 43.9 m (144 ft)
- Max Span
- 12.2 m
- Width
- 11.9 m (39 ft)
- Lanes
- 2
- Daily Traffic
- 1,071
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $258,000
- Total Project Cost
- $387,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.