IRR BIA RTE 5 over CIBOLA WASH
16.6 KM N OF NM ST HWY 53 · County 031, New Mexico · Built 1973 · 2 Lanes · 117 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
35.244583, -108.595378
This bridge is in worse condition than 46.4% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 53 years old.
Nearby Bridges
IRR BIA RTE 5 over RIO NUTRIA RIVER
Built 1973
IRR BIA RTE 32 over RIO NUTRIA
Built 1997
IRR BIA RTE 5 over BRANCH WASH-NUTRIA LAKE
Built 1973
43-Z001 over Bernalillo Main Canal
Built 1985
IRR BIA RTE 5 over RIO PESCADO RIVER
Built 1973
NM-53 over TOGEYE CANYON
Built 1988
IRR/NM-53 over RIO PESCADO
Built 1987
NM-602 over UNNAMED WATERWAY
Built 1980
IRR BIA RTE 149 over DRAINAGE DITCH
Built 1987
31-MC10 over BREAD SPRING WASH
Built 1996
Bridge Details
- Structure #
- 00000000000M415
- Year Built
- 1973
- Length
- 19.5 m (64 ft)
- Max Span
- 3.1 m
- Width
- 13.4 m (44 ft)
- Lanes
- 2
- Daily Traffic
- 117
- Material
- Concrete
- Design
- Culvert
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $22,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.