NM-53 over TOGEYE CANYON
34.5 MI E OF ARIZ ST LINE · County 031, New Mexico · Built 1988 · 2 Lanes · 1,071 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
35.133375, -108.507592
This bridge is in worse condition than 46.4% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 38 years old.
Nearby Bridges
IRR BIA RTE 149 over DRAINAGE DITCH
Built 1987
IRR/NM-53 over RIO PESCADO
Built 1987
31-Z001 over CEBOLLA CREEK
Built 1974
IRR BIA RTE 5 over RIO PESCADO RIVER
Built 1973
IRR BIA RTE 5 over BRANCH WASH-NUTRIA LAKE
Built 1973
IRR BIA RTE 5 over CIBOLA WASH
Built 1973
IRR BIA RTE 5 over RIO NUTRIA RIVER
Built 1973
Bridge Details
- Structure #
- 000000000010020
- Year Built
- 1988
- Length
- 13.5 m (44.3 ft)
- Max Span
- 2.1 m
- Lanes
- 2
- Daily Traffic
- 1,071
- Material
- Steel
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.