IRR BIA RTE 5 over BRANCH WASH-NUTRIA LAKE
11.9 KM NORTH JCT 5 & 53 · County 031, New Mexico · Built 1973 · 2 Lanes · 100 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
35.216239, -108.624167
This bridge is in worse condition than 62.6% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 53 years old.
Nearby Bridges
IRR BIA RTE 5 over CIBOLA WASH
Built 1973
IRR BIA RTE 5 over RIO NUTRIA RIVER
Built 1973
IRR BIA RTE 32 over RIO NUTRIA
Built 1997
IRR BIA RTE 5 over RIO PESCADO RIVER
Built 1973
IRR/NM-602 over RIO NUTRIA
Built 2007
IRR/NM-53 over RIO PESCADO
Built 1987
IRR/NM-602 over RIO PESCADO
Built 1968
IRR/NM-53 over HORSEHEAD CANYON
Built 1986
43-Z001 over Bernalillo Main Canal
Built 1985
31-003A over UNNAMED WATERWAY
Built 1966
Bridge Details
- Structure #
- 00000000000M412
- Year Built
- 1973
- Length
- 16.2 m (53.1 ft)
- Max Span
- 3.1 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Concrete
- Design
- Culvert
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $46,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.