IRR/NM-602 over RIO NUTRIA
1.6 Mi N of NM-53 · County 031, New Mexico · Built 2007 · 2 Lanes · 1,146 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.134947, -108.707164
This bridge is in worse condition than 46.4% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 19 years old.
Nearby Bridges
IRR/NM-602 over RIO PESCADO
Built 1968
IRR/NM-53 over HORSEHEAD CANYON
Built 1986
IRR BIA RTE 5 over RIO PESCADO RIVER
Built 1973
IRR BIA RTE 4 over ZUNI RIVER
Built 1976
NM-36 over KNIFE HILL CANYON
Built 1990
31-003A over UNNAMED WATERWAY
Built 1966
IRR/NM-53 over RIO PESCADO
Built 1987
IRR BIA RTE 327 over ZUNI RIVER
Built 1991
IRR BIA RTE 5 over BRANCH WASH-NUTRIA LAKE
Built 1973
IRR/NM-53 over ZUNI RIVER
Built 1975
Bridge Details
- Structure #
- 000000000009368
- Year Built
- 2007
- Length
- 40.8 m (133.9 ft)
- Max Span
- 20.1 m
- Width
- 13.4 m (44 ft)
- Lanes
- 2
- Daily Traffic
- 1,146
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.