IRR/NM-602 over RIO NUTRIA

1.6 Mi N of NM-53 · County 031, New Mexico · Built 2007 · 2 Lanes · 1,146 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000009368
Year Built
2007
Length
40.8 m (133.9 ft)
Max Span
20.1 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
1,146
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.