IRR BIA RTE 327 over ZUNI RIVER
ZUNI PUEBLO .6 KM S.HWY53 · County 031, New Mexico · Built 1991 · 2 Lanes · 450 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
35.077956, -108.815814
This bridge is in worse condition than 62.6% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 35 years old.
Nearby Bridges
IRR/NM-53 over ZUNI RIVER
Built 1975
IRR BIA RTE 327 over ZUNI RIVER
Built 1979
IRR BIA RTE 4 over ZUNI RIVER
Built 1976
IRR/NM-602 over RIO PESCADO
Built 1968
IRR/NM-53 over HORSEHEAD CANYON
Built 1986
IRR/NM-602 over RIO NUTRIA
Built 2007
NM-36 over KNIFE HILL CANYON
Built 1990
31-003A over UNNAMED WATERWAY
Built 1966
Bridge Details
- Structure #
- 00000000000M419
- Year Built
- 1991
- Length
- 27.5 m (90.2 ft)
- Max Span
- 3.1 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 450
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.