IRR/NM-53 over HORSEHEAD CANYON
0.01 MI E OF NM-602/ZUNI · County 031, New Mexico · Built 1986 · 2 Lanes · 1,638 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
35.11435, -108.695997
This bridge is in worse condition than 62.6% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 40 years old.
Nearby Bridges
IRR/NM-602 over RIO PESCADO
Built 1968
IRR/NM-602 over RIO NUTRIA
Built 2007
IRR BIA RTE 5 over RIO PESCADO RIVER
Built 1973
IRR BIA RTE 4 over ZUNI RIVER
Built 1976
NM-36 over KNIFE HILL CANYON
Built 1990
IRR/NM-53 over RIO PESCADO
Built 1987
IRR BIA RTE 327 over ZUNI RIVER
Built 1991
IRR/NM-53 over ZUNI RIVER
Built 1975
IRR BIA RTE 5 over BRANCH WASH-NUTRIA LAKE
Built 1973
31-003A over UNNAMED WATERWAY
Built 1966
Bridge Details
- Structure #
- 000000000008500
- Year Built
- 1986
- Length
- 7.6 m (24.9 ft)
- Max Span
- 3.7 m
- Lanes
- 2
- Daily Traffic
- 1,638
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $74,000
- Total Project Cost
- $112,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.